REQUIREMENTS for INSTALLATION:
 


Product: Product Cycle: Installation

 

 

The NCBA is installed under supervision of a Catchcon Engineering Technical Expert and signed off by the original inventor or the product, Mr Harry Nieuwoudt. Installation drawings to be provided either by Catchcon Engineer or by clients Engineer when requested.

 

  Requirements for Installation of the Nieuwoudt Belt-Trap 
1. All lifting and electric equipment must be in good working condition.
2. Heavy objects must be hoisted with lifting equipment.
3. The use and ware of safety belts, and other safety protective ware is compulsory.
4. No person(s) should pass under installation area during installation period.
5. The Mines/Clients Electrician is responsible for isolating the action of the conveyor belt into an inactive state during installation of the Nieuwoudt Belt-Trap.
6. Area around and under conveyor belt area must be cleaned after completion of the installation of the Nieuwoudt Belt-Trap.
7. Safety procedures for a lockout on the conveyor belt during installation must be adhered to.


MAINTENANCE:

1. The two idler rollers on the Nieuwoudt Belt-Trap on which the belt runs must be visually examined and replaced on a regular basis.
2. Dust and any solids have to be removed from the Nieuwoudt Belt-Trap when conveyor belt is not running.